Please be advised that DalSpace will be unavailable from June 19 to July 7 for a system migration and upgrade. Graduate students who are required to submit their thesis during this period are asked to contact thesis.review@dal.ca, for instructions on how to proceed. For all other submissions, please return on July 7 to upload your material. Starting on July 7, the new URL for DalSpace will be dal.scholaris.ca . Thank you for your patience.
Repository logo

MEDIUM TERM PRODUCTION PLANNING AND CAMPAIGN SCHEDULING FOR SAWMILL

Loading...
Thumbnail Image

Authors

Saadatyar, Sina

Journal Title

Journal ISSN

Volume Title

Publisher

Abstract

In this thesis, we study a multi-period, multi-product, production planning problem for the lumber industry, and present a hierarchical approach to control and schedule lumber production in a sawmill. First, at the sawing unit, the lower level of the hierarchical structure, the combination of log classes, price lists and sawing patterns defines the expected output distribution in terms of lumber pieces. A price list, defining the value of outputs, is fed directly to the sawmill production control optimizer to select the best sawing patterns. This results in a broad variety of different lumber outputs. Second, at the upper level, a mixed integer programming model has been proposed to maximize the total revenue at the sawmill. The lumber outputs determined at the lower level are used as data at the upper level. Market demand, lumber inventory cost, and supply cost are considered over the planning horizon. The proposed model has been developed and implemented on a real-scale prototype sawmill.

Description

Keywords

Production Planning, Supply Chain, Scheduling, Sawmill, Lumber Industry

Citation