dc.contributor.author | Earle, Jen | |
dc.date.accessioned | 2012-08-13T16:36:36Z | |
dc.date.available | 2012-08-13T16:36:36Z | |
dc.date.issued | 2012-08-13 | |
dc.identifier.uri | http://hdl.handle.net/10222/15220 | |
dc.description.abstract | This thesis is an exploration in deployable architecture, focusing on long span structural design. The application for the design will be a summer theatre for the Halifax Commons. The deployment of the structure will be for a five month duration, therefore important design
considerations will be durability, waterproofing, as well as assembly, disassembly and storage. | en_US |
dc.language.iso | en | en_US |
dc.subject | Deployable Architecture | en_US |
dc.title | Deployable Architecture: A Seasonal Theatre for the Halifax Commons | en_US |
dc.date.defence | 2012-07-10 | |
dc.contributor.department | School of Architecture | en_US |
dc.contributor.degree | Master of Architecture | en_US |
dc.contributor.external-examiner | Peter Sassenroth | en_US |
dc.contributor.graduate-coordinator | Stephen Parcell | en_US |
dc.contributor.thesis-reader | Sarah Bonnemaison | en_US |
dc.contributor.thesis-supervisor | Susan Molesky | en_US |
dc.contributor.ethics-approval | Not Applicable | en_US |
dc.contributor.manuscripts | Not Applicable | en_US |
dc.contributor.copyright-release | Not Applicable | en_US |